图书介绍
井巷设计与施工pdf电子书版本下载
- 董方庭等主编 著
- 出版社: 徐州:中国矿业大学出版社
- ISBN:7810215523
- 出版时间:1991
- 标注页数:518页
- 文件大小:41MB
- 文件页数:523页
- 主题词:
PDF下载
下载说明
井巷设计与施工PDF格式电子书版下载
下载的文件为RAR压缩包。需要使用解压软件进行解压得到PDF格式图书。建议使用BT下载工具Free Download Manager进行下载,简称FDM(免费,没有广告,支持多平台)。本站资源全部打包为BT种子。所以需要使用专业的BT下载软件进行下载。如 BitComet qBittorrent uTorrent等BT下载工具。迅雷目前由于本站不是热门资源。不推荐使用!后期资源热门了。安装了迅雷也可以迅雷进行下载!
(文件页数 要大于 标注页数,上中下等多册电子书除外)
注意:本站所有压缩包均有解压码: 点击下载压缩包解压工具
图书目录
PART Ⅰ DRIFT AND CHAMBER 3
Chapter 1 Rock Drift 3
1.1 Cross Section Design 3
1.2 Drilling and Blasting 21
1.3 Mucking 35
1.4 Supporting 52
1.5 Ventilation and Dust Suppression 74
1.6 Construction Methods for Tunnelling in Loose and Crushed Rocks 76
1.7 Tunnel Boring Machine 78
1.8 Tunnelling Methods & Organization and Management of Drift Crew 81
Chapter 2 Pit Bottom and Chamber 87
2.1 Structure and Type of Pit Bottom 87
2.2 Design of Major Chambers in Shaft Inset 92
2.3 Chamber Construction 108
2.4 Drift Crossing Design 123
2.5 Crossing Construction 131
Chapter 3 Drifts in Mining District 137
3.1 Method of Orientation for Development Drifting in Mining District 138
3.2 Coal Heading Construction 141
3.3 Alternate Heading Construction 152
3.4 Rise and Dip Construction 154
Chapter 4 Inclined Shaft 158
4.1 Structure of Inclined Shaft 158
4.2 Construction of Inclined Shaft 182
5.1 Introduction 201
Chapter 5 Vertical Shaft Design 201
PART Ⅱ VERTICAL SHAFT 201
5.2 Rigid Equipment of Shaft 204
5.3 Flexible Equipment of Shaft 213
5.4 Arrangement of Shaft Section 218
5.5 Design of Shaft Section 229
5.6 Shaft Collar and Shaft Sump 237
Chapter 6 Shaft Sinking 248
6.1 Sinking Through Surface Ground 248
6.2 Drilling and Blasting 263
6.3 Mucking 277
6.4 Shaft Lining 295
6.5 Control of Falling Water in Shaft 317
6.6 Other Auxiliary Works 332
6.7 Shaft Installation 338
6.8 Construction Scheme and Organization 345
6.9 Arrangement of Shaft Sinking Equipment 363
6.10 The Technical Development of Shaft Sinking Method 379
7.1 Sinking Headframe 388
Chapter 7 Shaft Sinking Structures 388
7.2 Working Platforms for shaft Sinking 410
7.3 Forms for Walling the Shaft 423
Chapter 8 Deepening of Vertical Shaft 432
8.1 Introduction 432
8.2 Protective Facilities for Shaft Deepening 435
8.3 Shaft Deepening by Using An Auxiliary Level 446
8.4 Shaft Deepening with A Deepening Compartment 453
8.5 Shaft Deepening by A Conventional Raise 456
8.6 Raise Driving with A Suspended Cage 461
8.7 Other Shaft Deepening Methods 467
8.8 Selection of Shaft Deepening Schemes 469
PART Ⅲ LABOR ORGANIZATION AND MANAGEMENT IN MINE CONSTRUCTION 477
Chapter 9 Preparations of Mine Construction 477
9.1 Contents of Preparation for Construction 478
9.2 General Working Plan of the Surface Shaft-site 481
9.3 Major Approaches for Shortening the Preparation Period 483
10.1 Mining Engineering Scheme and Sequence of Shaft Sinking 489
Chapter 10 Sequence of Shaft-sinking and Drifting 489
10.2 Modification Work in the Transitional Period fromShaft Sinking into Roadway Drifting 493
10.3 Sequence for Developing Shaft Station and Chambers 503
10.4 Arrangement of Roadway Drifting in Mining Sections 505
Chapter 11 Management of Mine Construction 506
11.1 Drawing up Design of Working Organization 506
11.2 Technical Management 510
11.3 Project Management 513